Railway Fasteners and Track Components from a Shanghai Supplier
Yuerui is a Shanghai-based supplier and exporter of railway fasteners and track components — railway insulators, rail clips, rail pads, nuts and washers — working through qualified supply chain partners, and supplying to the track standard each project specifies.
- Based in
- Shanghai, China
- Typical lead time
- About one month
- Shipping ports
- Shanghai / Ningbo

Browse rail fastener types
Rail clipsElastic rail clips including E-type, SKL, Type I, II and III, Nabla and standard-specific clips.
Rail padsRubber and thermoplastic under-rail pads, under tie pads and height adjusting pads.
Rail insulatorsGauge blocks, nylon baffle seats, plastic dowels and dowel holders for concrete sleepers.
Track boltsTrack bolts and fish bolts with nuts, spring washers and flat washers.
Railroad spikesDog spikes, screw spikes and coach screws for timber and concrete sleepers.
Railway base platesTie plates and base plates for metro, mainline and timber sleeper track.
- Gauge rods
Plain and insulated gauge tie rods that hold track gauge.
- Rail anchors
Rail anchors that resist longitudinal rail creep.
Rail fishplatesUIC, AREMA, JIS and Chinese-standard fishplates, plain and insulated.
Railway Fasteners from a Shanghai-Based Supplier
Yuerui is a Shanghai-based supplier and exporter of railway track fasteners and track components, including railway insulators, rail clips, rail pads, nuts and washers, working through qualified supply chain partners. Fasteners are made to the track standard a project specifies, including Chinese, European, Russian GOST, Ukrainian DSTU and American AREMA standards. The catalogue includes Nabla type elastic clips, Type-D spring clips, German standard clips, Russian standard spring clips, fishplates and rail bolts. MTC/COC, dimensional inspection, mechanical test and coating thickness reports can be provided, and third-party testing is supported for railway project tender requirements.
Send the rail profile, sleeper type and standard through the inquiry form. Rail track fasteners hold the rail to the sleeper at the correct gauge and inclination and resist longitudinal, lateral and vertical forces. An assembly combines an elastic clip, a rail pad, an insulator, a shoulder or anchor and a sleeper fixing; the rail fastening systems guide explains the parts. Tie fasteners follow sleeper type: spikes and screw spikes for timber, plastic dowels and clips for concrete, pads under rail or sleeper. Yuerui lists rail clips, rail pads, insulators, spikes, threaded fasteners, L-head spikes, screw spikes, plastic dowels, dowel holders, under tie pads and height adjusting pads.
- Metal parts: gauge baffles, joint bars (fishplates), turnout special base plates, elastic clips and rail joint splints
- Metal parts: high-speed passenger dedicated line clip fasteners, railroad spikes and multi-element co-permeation anti-corrosion fittings
- Non-metallic parts: high-speed rail height-adjusting base plates, rubber base plates, nylon baffles, HDPE rail pads and insulation pads
- Turnout and inspection items: switch machine replacement parts, turnout gauge blocks and railway inspection hammers
Yuerui supports mixed loading of various railway track accessories, so different rail fasteners can be ordered in one shipment to cut logistics costs and simplify procurement. Quotes are given on EXW, FOB, CIF or DAP terms in USD or CNY, payment is by L/C, T/T, D/P, PayPal or Western Union, and orders ship from Shanghai Port or Ningbo Port, with a typical lead time of about one month depending on product and order quantity.
Track components we supply
The fasteners in railway track that a project needs follow the rail profile, the sleeper type, the traffic loading and the track standard the project specifies, so a light passenger line and a heavy haul line take different assemblies from the same family. Yuerui quotes fasteners made to that specified standard rather than a single fixed type. Include the rail profile, sleeper drawing and standard in the inquiry so the right assembly can be quoted.
Around the fastening assembly, a track section also uses base plates or tie plates under the rail, gauge rods that hold the rails at the set distance, rail anchors that limit longitudinal creep, and track bolts that join fishplates at rail ends. These parts are quoted with the clips and pads once the profile, sleeper and standard are known, which keeps one quotation to a complete track section.
Railroad Tie Fasteners for Concrete, Timber and Composite Sleepers
Timber sleepers take spikes or screw spikes through a tie plate, concrete sleepers hold clips through cast-in plastic dowels or shoulders over pads and insulators, and composite sleepers take fastenings matched to their own fixing detail. Yuerui supplies rail spikes for timber and concrete fixing, plastic dowels and dowel holders for concrete sleeper casting, and under tie pads beneath the sleeper.
To confirm that rail fastenings and fixtures match your drawings, Yuerui confirms a pre-production sample before the order runs and carries out a 100% final inspection before shipment. MTC/COC documents, dimensional inspection reports, mechanical test reports and coating thickness reports can be provided. ODM service is offered, with customization from samples or from the buyer’s designs. Send drawings, samples or the tender specification with the inquiry so the quoted fastenings match them.
Rail Track Fasteners and Fasteners in Railway Track
Fittings finish the assembly where fasteners alone do not cover insulation, padding, gauge adjustment or creep. Insulated rail clips and insulating components separate the rail from the fastening in track-circuit and signal areas, while rail pads, including HDPE and insulation pads, sit under the rail. Compatibility depends on the specified fastening system, the rail profile and the sleeper type, so the fittings are chosen together with the clips and pads they serve.
- Nylon baffle seats, made of nylon with high wear, impact and chemical resistance, used to support, install, adjust and fix railway fasteners
- Gauge baffle plates for track gauge adjustment, including heavy haul gauge plates for heavy duty track
- Rail anti-creep devices that resist longitudinal rail movement
- Insulated fishplates that join rails while cutting current between them, avoiding track circuit short-circuit and signal faults
How an order works
- Send your details
- Part type, rail profile, track standard or drawing, quantity and destination port.
- Quotation and sample
- Yuerui quotes on EXW, FOB, CIF or DAP terms and confirms a pre-production sample before the order runs.
- Payment
- Payment by L/C, T/T, D/P, PayPal or Western Union, in USD or CNY.
- Inspection
- A 100% final inspection is carried out before shipment.
- Lead time and shipping
- Lead time is usually about one month, depending on product and quantity; orders ship from Shanghai Port or Ningbo Port.
Request a quotation
Tell us the parts you need, the rail profile, the track standard and the quantity.
Or write to sales@railwayfastenersupply.com