YueruiRequest a quotationQuote

Rail Pad Guide for Railway Track Fastening

A rail pad is the elastic layer under the rail foot: it spreads load, damps vibration, protects sleepers and baseplates, and keeps track geometry stable. Pad selection follows rail profile, sleeper type, fastener system, axle load and project standard.

Request a quote for these parts

HS Code
8608009000
Type
Rail Pad
Usage
For train railway subway
Rail pads

Rail Pad Guide for Railway Track Fastening

A rail pad is an elastic component placed under the rail foot. It distributes wheel load into the sleeper or baseplate, damps vibration, protects sleepers and baseplates from abrasion and impact, and supports track stability. Selection depends on rail profile, sleeper type, fastener system, axle load and project standard. Yuerui supplies rail pads through qualified supply chain partners to Chinese, European, GOST, DSTU and AREMA standards, supports ODM from samples or buyer designs, and can provide MTC/COC, dimensional inspection, mechanical test and coating thickness reports.

A rail rubber pad is an elastomeric pad under the rail foot used for load distribution, vibration damping and protection of track components. Its compound, stiffness and dimensions must be matched to the fastener system, sleeper type, rail profile and project standard; a pad that suits one assembly is not automatically right for another. Yuerui’s list includes an under-rail rubber pad with a smooth and flat appearance, and a TPEE under-rail pad developed to improve track elasticity, vibration damping and stability beneath the rail base.

Rubber rail pad is the same product concept under another name. Buyers specify it by rail profile, pad dimensions, stiffness or compression behaviour, the fastener interface it sits in, sleeper or baseplate type and track standard. Yuerui can review samples or buyer designs for ODM supply and can provide inspection documents for project review, including dimensional inspection reports and mechanical test reports.

An under rail pad sits between the rail foot and the sleeper or baseplate as part of the fastening assembly. It helps distribute load, damp vibration and protect the components above and below it. It must be matched to rail profile, sleeper or baseplate, clip system and standard, and may be used with rail clips, insulating components and height-adjusting pads where the assembly requires them. Yuerui lists under-rail pads, WJ-8 rubber pads and P50 and P60 pads as separate items; the exact model depends on the system. Installation checks include a clean seat, correct pad orientation, clip tension and insulation continuity.

Rail pad specifications

Heavy duty P60 rubber pad noise reduction pad high speed heavy haul rail
ParameterValue
HS Code8608009000
TypeRail Pad
UsageFor train railway subway
PackStandard Package
CustomizedSupport OEM/ODM
AppearanceSmooth and Flat
Transport PackageContainer
Heavy duty under tie pads anti vibration rail sleeper pads high axle load lines
ParameterValue
Product NameUnder Tie Pad
MaterialPolyurethane
UsageBallast Protection , Track Stabilization
PackPallet
SizeCustomized
Applicable TracksHigh Speed Rail, Heavy Haul Railway
ColorBlack
High performance under tie pads elastic sleeper pads ballasted railway tracks
ParameterValue
Product NameUnder Tie Pad
MaterialPolyurethane
UsageBallast Protection , Track Stabilization
PackPallet
SizeCustomized
Applicable TracksHigh Speed Rail, Heavy Haul Railway
ColorBlack
Under rail rubber pad shock absorption rail base pad for concrete sleepers
ParameterValue
HS Code8608009000
TypeRail Pad
UsageFor train railway subway
PackStandard Package
CustomizedSupport OEM/ODM
AppearanceSmooth and Flat
Transport PackageContainer
P60 rubber pad
TypeDiameter(mm)Weight(kg)Material
WJ8-B285mm*150mm*12mm0.35kgThermoplastic elastomer
WJ8-6175mm*160mm0.24kgPremium natural rubber or synthetic rubber
P50185mm*131mm*10mm0.29kgPremium natural rubber or synthetic rubber
P60185mm*151mm*10mm0.34kgPremium natural rubber or synthetic rubber

Rail Pad Types Listed for Different Track and Fastening Systems

Each listed pad is tied to a particular rail section or fastener system, so the model name is the first selection step. The list follows how Yuerui’s range is described, so a buyer can match a pad to a project’s rail profile, sleeper or baseplate and fastening standard.

  • P60 Rubber Pad: a modified elastic rubber mat matched with 60kg/m heavy haul rails, applied in high-speed lines, heavy-haul routes, metro systems, light rail and standard-gauge tracks.
  • P50 Rubber Pad: a rail component that provides elasticity and stability for rail fastening systems, applied in urban transit lines, heavy freight corridors, industrial railways and standard mainline tracks.
  • WJ-8 Rubber Pad: listed for tracks equipped with WJ-8 fastening systems, including high-speed railways, heavy-haul freight lines, metro systems, light rail and standard mainline tracks.
  • WJ7 Height-Adjusting Pad: a high-rigidity hard composite plate matched with the WJ7 fastener system to adjust rail elevation and track geometry; compatible with concrete and composite sleepers and used with under-rail pads, clips and insulating components.
  • Custom stiffness TPEE rail pads: compatible with WJ7/WJ8 and all standard fastener systems, with concrete, wood and composite sleepers and with P50, P60 and UIC60 rails; described as resistant to low and high temperatures, salt fog and aging.
  • Turnout Rubber Pads: customized high-density reinforced rubber mats intended for switch and turnout sections.

Under tie pads are listed as a separate item; they are elastomeric components intended to protect track infrastructure and improve stability and comfort beneath the sleeper. Dimensional, packing and other parameters for the listed pads appear in the tables below.

Specifying a Rail Pad and Placing an Order with Yuerui

A specification starts with the rail profile, the track standard the project follows, drawings or samples of the pad and the quantity required. Yuerui quotes on EXW, FOB, CIF or DAP terms and accepts payment by L/C, T/T, D/P, PayPal or Western Union in USD or CNY. Typical lead time is about one month in both peak and off season, depending on product and order quantity.

  • Rail profile, standard, drawings or samples and quantity reviewed against the fastening system
  • Pre-production sample confirmed before supply
  • 100% final inspection before shipment
  • MTC/COC, dimensional inspection, mechanical test and coating thickness reports, with third-party testing support for project tender requirements
  • Packing and shipping from Shanghai Port or Ningbo Port

Yuerui supplies rail fasteners through qualified supply chain partners and has export experience across Asia, Africa and the Middle East, including cross-border logistics and customs clearance. Pads are supplied with clips, plates and insulating parts as the assembly requires; the rail fastening systems guide explains how these parts work together. Project details sent through the contact page start a quotation.

How an order works

Send your details
Part type, rail profile, track standard or drawing, quantity and destination port.
Quotation and sample
Yuerui quotes on EXW, FOB, CIF or DAP terms and confirms a pre-production sample before the order runs.
Payment
Payment by L/C, T/T, D/P, PayPal or Western Union, in USD or CNY.
Inspection
A 100% final inspection is carried out before shipment.
Lead time and shipping
Lead time is usually about one month, depending on product and quantity; orders ship from Shanghai Port or Ningbo Port.

Request a quotation

Send the type, rail profile or drawing, standard and quantity; we will quote the matching items.

Or write to sales@railwayfastenersupply.com

* Required