YueruiRequest a quotationQuote

Gauge Rod and Rail Gauge Tie Rods for Track Gauge Control

A gauge rod links two rails and holds them at the required track gauge. Yuerui, a Shanghai-based trading supplier, supplies gauge tie rods, insulated gauge tie rods and related track fastening components through qualified supply chain partners.

Request a quote for these parts

Typical lead time
About one month
Trade terms
EXW, FOB, CIF, DAP
Rail gauge tie rods

Gauge Rod Series in the Yuerui Catalogue

A gauge rod is a track component that links two rails and holds them at the required spacing, so the track keeps its gauge under traffic and lateral load. It sits inside the wider gauge rod series in the Yuerui catalogue, which covers gauge tie rods and insulated gauge tie rods. Yuerui is a Shanghai-based trading supplier of railway fasteners and track components supplied through qualified supply chain partners. Typical lead time is about one month, depending on product and order quantity, and Yuerui quotes on EXW, FOB, CIF or DAP terms on inquiry.

Shop listings follow the same split. The insulated railway gauge rod is listed as a signal-protected track tie rod and fastening component, and the standard gauge rod as a heavy duty tie rod for railway track adjustment. Both sit within the same fastening range as the other track parts, so rail clips and rail insulators can be reviewed for the track section being worked on.

Gauge rods are ordered as part of the fastening assembly rather than in isolation. The rail profile, pad, clip and insulator chosen for the sleeper or slab decide how a rod sits against the rail web, and the rail fastening systems guide explains how those parts work together.

Gauge Rod Supply and Track Gauge Control

A rail gauge rod is selected from the rail it clamps and the fastening system it has to work with, not from a catalogue page alone. Send the track details with the inquiry so the rod is matched to the installation:

  • Rail profile and section
  • Nominal track gauge
  • Sleeper or slab type
  • The fastening system already in use on the line
  • Whether the line is signalled, so an insulated rod is required

Rail fasteners and components are supplied to the track standard the project specifies, including Chinese, European, Russian GOST, Ukrainian DSTU and American AREMA standards. With the profile, gauge and standard confirmed, buyers can send these details through the contact page for a quotation on EXW, FOB, CIF or DAP terms. Yuerui confirms a pre-production sample and carries out 100% final inspection before shipment.

A rail gauge tie rod and a gauge rod refer to the same component. The shop carries a gauge tie rod listing and an insulated gauge tie rod listing; the insulated type keeps the rod from bridging the track circuit, so it protects track circuits and signalling on equipped lines. Gauge tie rods can be supplied in customizable lengths to match standard track gauges, with optional paint or hot-dip galvanized anti-corrosion finish. ODM service is offered, with customization from samples or from the buyer’s designs.

Rail Gauge Rod Types, Materials and Insulation Options

On a railroad, a gauge rod is clamped across the two rails and bolted or clamped to the rail web or head. It maintains gauge and adds lateral restraint, which is why it is commonly used on curves, bridges, turnouts and temporary or emergency track, where rail alignment is most exposed to spreading. Because it ties the rails together at a fixed spacing, the rod also stiffens the track panel against lateral movement, working alongside the sleeper fastening rather than replacing it.

Fitting follows the track layout. The rod is set across the rails at the marked position, fixed to the web or head with the matching bolts or clamps, and checked for gauge before the connections are finally tightened. During track maintenance the rod is re-checked with the other gauge measurements, and any rod loosened by tamping, lifting or re-railing is reset so the rails return to the required spacing.

Type follows the location. Plain gauge tie rods suit track where no track circuit exists, while insulated gauge tie rods are chosen where the rod crosses a signalled section and must not conduct between rails. Finish is a separate decision: gauge tie rods can be supplied with paint or hot-dip galvanized anti-corrosion finish, and the product has a certain corrosion resistance.

How an order works

Send your details
Part type, rail profile, track standard or drawing, quantity and destination port.
Quotation and sample
Yuerui quotes on EXW, FOB, CIF or DAP terms and confirms a pre-production sample before the order runs.
Payment
Payment by L/C, T/T, D/P, PayPal or Western Union, in USD or CNY.
Inspection
A 100% final inspection is carried out before shipment.
Lead time and shipping
Lead time is usually about one month, depending on product and quantity; orders ship from Shanghai Port or Ningbo Port.

Request a quotation

Send the type, rail profile or drawing, standard and quantity; we will quote the matching items.

Or write to sales@railwayfastenersupply.com

* Required