YueruiRequest a quotationQuote

Rail Insulator and Nylon Insulation Components for Track Fastening

Yuerui supplies rail insulators and nylon insulation components for track fastening — gauge blocks, baffle seats, plastic dowels and dowel holders — through qualified supply chain partners, matched to the rail profile, sleeper type and standard a project specifies.

Request a quote for these parts

Product Name
Dowel Holder
Material
Polyurethane
Usage
Sleeper Molding Production Line
Rail insulators and gauge blocks

Rail Insulator Types and Materials

Yuerui supplies the rail insulator parts of a fastening system through qualified supply chain partners. Gauge blocks adjust the gauge and insulate the connection between the rail and the ground. Nylon baffle seats support, install, adjust and fix railway fasteners and equipment. Plastic dowels form the threaded sleeve cast into a concrete sleeper. Insulating rail clips and insulated fishplates carry the same duty at the clip and at the joint. Each part is supplied for the fastening system it belongs to, not as a universal fit.

  • Gauge blocks for standard, high-speed and metro rails, including WJ-8 gauge blocks
  • Switch and turnout gauge blocks: reinforced high-toughness nylon positioning insulators for turnout switch and frog sections of high-speed, heavy haul and metro junction lines
  • Nylon baffle seats: nylon supports that hold, adjust and fix railway fasteners and equipment
  • Rail plastic dowels: reinforced nylon threaded sleeves pre-buried in concrete sleepers for ballastless track fastener systems
  • Dowel holders, listed separately: positioning parts used when concrete sleepers are cast, with material stated only as written on each listing

The nylon parts in the range are gauge blocks for standard, high-speed and metro rails, turnout gauge blocks, nylon baffle seats and plastic dowels for concrete sleepers. The nylon formula behind a listing matters where a line runs through tunnels, along the coast or in alpine territory: WJ-8 gauge block listings name a low-temperature resistant, anti-aging and wear-resistant modified nylon, and full-spec nylon stop block bases name a hydrolysis-resistant, low-temperature anti-brittle formula. Dowel holders are positioning parts used when concrete sleepers are cast, with material stated only on each listing. ODM service is available, including customization from samples or from the buyer’s designs.

Selection turns on the rail profile, the sleeper type, the fastening system and the track standard the project specifies. A WJ-8 gauge block belongs with a WJ-8 fastening assembly, and a turnout block is shaped for switch and frog sections. Yuerui supplies fasteners made to Chinese, European, Russian GOST, Ukrainian DSTU and American AREMA standards. Sending the rail profile, standard, drawings and quantity starts a quotation; the rail fastening systems guide shows where insulating parts sit among clips, pads and anchors.

Rail insulator specifications

In track-engineering terms, an insulator separates the rail from the fastening and the support beneath it so that the track circuit and the signalling system stay electrically isolated. The insulating part sits wherever a conductive path would otherwise close: between the rail foot and the clip, inside the gauge block seat, around a dowel, or as a coating on a fastener. Insulation is required wherever a track circuit is used to detect trains, and the assembly is read as one electrical circuit.

The insulator also limits stray currents and helps prevent galvanic corrosion where dissimilar metals meet in the assembly. A steel clip, a bolt and a coated block in contact in a damp tunnel create the conditions for current-driven corrosion; an insulating layer breaks that contact. In wet, coastal or tunnel conditions surface films can bridge small gaps, so insulating faces are kept continuous and mating faces clean during installation.

Track fastening insulators are a different category from the insulators used on catenary and third-rail electrification, which stand off high voltage on masts and support structures. This page covers the track fastening type only. Dimensions and material grade follow the fastening system drawing and the track standard a project specifies rather than one catalogue value, and parameter values for each item are set out in the tables below.

Dowel holder accurate positioning components railway concrete sleeper fastening system
ParameterValue
Product NameDowel Holder
MaterialPolyurethane
UsageSleeper Molding Production Line
Packcarton
SizeCustomized
structureWith External Thread
ColorBlue, Red
Transport PackageWood or Iron Pallet
Railway nylon dowel holder for concrete sleeper rail fastening system spare parts
ParameterValue
Product NameDowel Holder
MaterialPolyurethane
UsageSleeper Molding Production Line
Packcarton
SizeCustomized
structureWith External Thread
ColorBlue, Red
Transport PackageWood or Iron Pallet
Railway plastic dowels compression resistant rail fastening spare parts
ParameterValue
TypeRail Plastic Dowels
OriginChina
UsageFor train railway subway
TrademarkYuerui
HS Code8608009000
Transport PackagePallet
Train components switch gauge block railway track fastening system
ParameterValue
TypeGauge Block
OriginChina
UsageFor train railway subway
TrademarkYuerui
HS Code8608009000
Transport PackagePallet

Insulation at Clips, Pads and Rail Joints

Insulation is not confined to blocks and dowels. Insulating Rail Clips are listed with an integrated high-insulation coating on anti-fatigue spring steel. Under the rail, rail pads form the resilient layer, and where a joint needs separating, a Cemented Insulated Fishplate is listed in the range: an insulated fishplate connects two rails while cutting off current conduction between them, so a track circuit is not short-circuited at the joint.

The rail clip range covers insulated and plain clips, the rail pad range covers the layer under the rail foot, and the fishplate guide explains how joints are designed and insulated. One WJ-8 fastening system or one turnout section may call for several different insulating parts, so the parts list is worth building before an order is placed.

How an order works

Send your details
Part type, rail profile, track standard or drawing, quantity and destination port.
Quotation and sample
Yuerui quotes on EXW, FOB, CIF or DAP terms and confirms a pre-production sample before the order runs.
Payment
Payment by L/C, T/T, D/P, PayPal or Western Union, in USD or CNY.
Inspection
A 100% final inspection is carried out before shipment.
Lead time and shipping
Lead time is usually about one month, depending on product and quantity; orders ship from Shanghai Port or Ningbo Port.

Request a quotation

Send the type, rail profile or drawing, standard and quantity; we will quote the matching items.

Or write to sales@railwayfastenersupply.com

* Required